Stratco Cambodia Engineering and Design Department building, in-factory

Stratco Cambodia

Running an engineering and design department.

Role
Design & Engineering Manager
Period
Jan to May 2026
Team
Two engineers
Problem
A small design and engineering team reliant on overseas support.
Approach
A clear workflow, ownership, and the tools to work independently.
Tools
SharePoint, Power Automate, project management, leadership.
Result
One product completed and five taken to sample in four months, across 22 projects.

Brief

Stratco's Cambodia operation did its design work inside production, with no shared workflow, documentation standard or clear view of the project pipeline. The Group CEO recruited me to run and formalise the function: lead the team, introduce a practical system, and help local projects move without overseas support.

The products and internal engineering material are confidential, so I cover only the work I owned and the outcomes I can share.

By the numbers

22Projects in portfolio
05to sampleTaken to sample in 4 months
02Engineers managed
06Stakeholders in scope

Workflow

01. Brief10%

Project Definition Brief

  • Problem capture
  • Competitor / IP research
  • Acceptance criteria up front

02. Design55%

Design and engineering

  • Detailed design (CAD)
  • Fabrication / Testing / FEA
  • Engineering Report

03. Sample / Production35%

First article and handoff

  • DFM review
  • Sample shipped
  • Approval and orders

Team and management

I managed two design engineers, one of them junior. I divided the workload, set a regular design-review rhythm, trained the team on the new procedures and took the higher-priority briefs myself. The team completed one product and took five more to sample.

I split my time between the design office and the factory floor. Smaller projects ran to a 90-day target; larger ones had their own plans. I also proposed a fortnightly portfolio update for executives across five business units, but it was not implemented before my engagement ended.

A SharePoint board refreshed the portfolio every day through Power Automate. The team worked from the same engineering-report template and a printed workflow mounted in the department, so the process was visible at a glance.

Universal Steel Testing Rig

Cambodia had been sending new products to Adelaide for testing, which could add months to a validation cycle. I was asked to develop a local lateral-load rig for testing against the AS/NZS 1170.2 N1 to N4 wind requirements.

With limited information about the Adelaide rig, I redesigned the structure around steel sections available in Cambodia. Stiffness mattered most, because frame movement would distort the product measurement. After several Inventor Simulation iterations, the released design's predicted displacement was 64% less than my first concept and within the sub-10mm frame-deflection budget at proof load.

I validated it with FEA against AS/NZS 1170.2 for N4 wind conditions and supervised its fabrication by a local supplier. Parts were still arriving when my role ended, so the rig was not assembled or tested during my engagement. Detailed drawings, images and load data remain internal to Stratco.

Predicted displacement vs concept64% less
Peak stress at proof8% of yield
Design wind conditionN4

Outcome

By the end of my engagement, the team had a visible 22-project pipeline, a three-stage workflow, and one product completed and five taken to sample in four months. A local test rig was designed and in fabrication to cut reliance on Adelaide testing. Everyone knew who owned each project, what came next, and how a brief reached the factory floor.